Armenia:
Consulting Services for Rehabilitation of the 220/110/10 kV Substation Gyumri II

The 220/110 kV substation Gyumri II is one of the central nodes in Armenia's HV transmission system. Built in 1972, it had been only partially refurbished after a severe earthquake in 1988, making its operation unreliable and unsafe. In addition, its communication system was more and more incompatible with other modernised 220 kV substations in the HV network. The present project therefore included a fundamental rehabilitation and partial reconstruction of the substation.


Services
  • Planning of measures, technical specifications and tender documents
  • Support during tendering, bid evaluation, and contract award
  • Site supervision, management of EPC contract
  • Monitoring of environmental safeguards and quality control
  • Factory acceptance testing, site testing, commissioning and handing over
  • Training programme
  • O&M plan
  • Implementation of SCADA
     
Technical Data
  • Replacement of the 220 and 110 kV outdoor switchgears (steel structures, insulators, cables, lighting system, monitoring system, earthing equipment and related civil works)
  • Renewal of the 10 kV indoor switchgear
  • Replacement of one 220/110/10 kV, 125 MVA power transformer, rehabilitation of a second one
  • Replacement of auxiliary equipment, communication system, measuring, control and protection equipment
  • New substation building
     

Client:
High Voltage Electrical Networks CJSC (HVEN)
Financing:
KfW Development Bank
Period:
2010 - 2014