Germany:
Engineering Services for a 110 kV GIS Switchgear in the New "Vulkanstrasse" Substation in Duisburg

The project includes the consolidation of three existing substations into a new 110/10 kV substation "Vulkanstrasse" for the implementation of the 110 kV target grid planning and due to the renewal of operating equipment.


Services
  • Service phases 1 to 8 of HOAI (German official scale of fees for services by architects and engineers)
  • Basic evaluation, site investigation, preliminary planning with cost estimate
  • Preliminary design, detailed design
  • Preparation and participation in contract award: specifications, evaluation of bids, participation in negotiations with bidders, award recommendation
  • Construction supervision and cost control
Technical Data
  • Building design
  • New 110 kV GIS switchgear, double busbar with 16 bays (indoor switchgear)
  • Installation of two 110/10 kV transformers and one 110/25 kV transformer
  • New 10 kV switchgear (GIS), double busbar with 64 bays
  • New 25 kV switchgear (GIS), double busbar with 4 bays
  • Star point switchgear, 2 auxiliary power units, ripple control system and L-coil switchgear

Client:
Stadtwerke Duisburg Netzgesellschaft mbH
Financing:
Stadtwerke Duisburg Netzgesellschaft mbH
Period:
2011 - 2019
Back to list